Bill of Materials (BOM) Take-Off
Reference only — not engineered / not sealed
Jayce is not a licensed engineer. This bill of materials is for estimating and reference only. Jayce assumes no liability for design, fabrication, erection, or construction. Have a licensed professional engineer review and stamp all work before use.
BOM PDF Preview
| Length (OAL) | Qty | LF |
|---|
| Length (OAL) | Qty | LF |
|---|
| Export | # | Category | Description | Length (OAL) | Qty | Unit | Galvanized? | Unit $ | Wt/Unit | Total Wt | Quote Unit | Quote Line | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Run calculations to build material list... | |||||||||||||
| Bay Sequence No. | Bracing Framework Required | Sidewall Opening(s) |
|---|---|---|
| Run calculations to build structural matrix... | ||
Trim Shop
Schedule · elevations · edit the selected trim profile in place
Automated 2D Shop Drawing Set
Full drawing set - elevations, erection plans, and Rigid Frame Shop primary fab sheets (S0.1-S6.0).
Reference only — not engineered / not sealed
Jayce is not a licensed engineer. Shop drawings are for estimating and reference only — have a PE review and stamp before use.
Run & Render Building to generate the 2D shop drawing set.
Drawing Index
Elevations
Plans & Sections
Construction Documents
Dimensioned erection grid, opening schedule, anchor bolt setting plan, and secondary framing schedule - project-specific data from the BOM.
Primary Frame Fabrication
Same S0.1–S6.0 set as the top Rigid Frame Shop tab — elevation, column/rafter fab, knee, ridge, base plate. Follows Configure Weld Up / Bolt Up.
Frame & Secondary Connection Details
Secondary details (portal, eave). Primary knee/ridge/base are in the fabrication set above.